Newsletter - Links - Advertise - Contact Us - Privacy
 

Buildings Archive 2019

Browse Buildings:
Buildings 91-98 out of 98 displayed.
 [1-15]  [16-30]  [31-45]  [46-60]  [61-75]  [76-90]  [91-98] 
2019
The initial competition brief from the client, Tollcross Housing Association, prioritised three fundamental requirements. First, the project would require a particular response to the context of the site on Tollcross Road, terminating the Western...

2019
TrägerHAUS is a private dwelling that embodies the traditional aesthetic of its context, with an ambition to create a dynamic and responsive architecture that exists synonymously with its location. Situated on the periphery of the Upper...

2019
The University of Edinburgh’s main Library Collections facility, at South Gyle, required an upgrade and refurbishment of a newly acquired storage unit, which was located within the existing annex building. This new facility was specially...

2019
The £110 million new University of the West of Scotland (UWS) campus at Hamilton International Technology Park developed by HFD Property Group (HFD) and designed by Mosaic Architecture + Design has opened its doors to the new student...

2019
Following an international open competition in 2013, Hoskins Architects – in collaboration with Ralph Appelbaum Associates – were appointed to redevelop the Weltmuseum Wien’s exhibition and visitor facilities. The 7,500m²...

2019
All of our buildings are designed from first principles and West Calder is no different. Despite an educational brief which is similar to our new secondary school in Perth, the West Calder design is again a unique response to a unique site. It...

2019
Working with Campus Living Villages and the University of St Andrews, HLM were appointed in November 2016 to develop proposals for two gap-sites within St Andrews located adjacent to existing student halls of residence. The accommodation brief...

2019
The new Woodside Health and Care Centre has been built to replace the existing 1970’s facility which has come to the end of its useful life no longer meeting current standards of building fabric, environmental conditions and accessibility....

Back to Scotland's New Buildings