Newsletter - Links - Advertise - Contact Us - Cookies
 

Portavadie Leisure & Spa

Multi-function building providing indoor and outdoor heated swimming pools, water features, gym, function suites, cafe/bar and spa with treatment rooms, relaxing area and hydrotherapy pool. The building is designed within the framework of the resort masterplan developed over 10 years by Stewart Associates. It is integrated with the site energy centre providing space heating and water from biomass boilers and CHP systems.
    Cafe and view to Pool Hall
Cafe and view to Pool Hall
 Reception area
Reception area
Entrances to building from boardwalk.
Entrances to building from boardwalk.

Upper floor Spa sauna with a view!
Upper floor Spa sauna with a view!
View from Loch Fyne breakwater. Poolhall and gym on ground floor and spa and external terrace on upper.
View from Loch Fyne breakwater. Poolhall and gym on ground floor and spa and external terrace on upper.
View of Outdoor pool terrace and main pool hall exterior.
View of Outdoor pool terrace and main pool hall exterior.

View of splash pool and spa
View of splash pool and spa
View to west in main pool hall.
View to west in main pool hall.

Back to Stewart Associates

Stewart Associates
Contact Details
Phone: 01475 670033/44
Fax: 01475 673103
Address:
The Studio
9 Waterside Street
Largs KA30 9LN
No. of architects: 4
No. of staff: 7
Principal Contacts
Principal:
Brian Stewart
Skills

Community architecture

DESIGN SOLUTIONS

Development briefs

Energy-conscious design

Furniture/fittings

Heritage

Interiors commercial

Interiors residential

Masterplanning

Perspective drawings

Project manager private sector

Project manager public sector

Signage and wayfinding

Sports

Sustainable design

Urban design

Subscribe to Urban Realm Magazine
Features & Reports
For more information from the industry visit our Features & Reports section.